| 2024. JAN 2025 DEC | UAE | ADNOC ONSHORE | BILFINGER TEBODIN MIDDLE EAST LTD | ADNOC ONSHORE ONE TIE-IN PROGRAM ADNOC Onshore Contract No.: 4700016096 ADNOC Onshore Project No.: P30345 | MATERIAL REQUISITION FOR SEAMLESS LINE PIPE, SOUR (PACKAGE 1 TO 12) |
| 2025. JAN 2026 DEC | UAE | ADNOC OFFSHORE | TARGET | 10527 - Zirku Oily Water Treatment Plant Upgrade Project 10529 – Zirku Instrument Air Network Upgrade Project Contract No. 6000036513 Contractor Project No. AET01204-00 | PIPE(SS) FITTING(SS) FLANGE(SS) |
| 2025. JAN 2026 DEC | UAE | ADNOF OFFSHORE | TARGET | Project No. (SAP No.): E1615 (10527) / E1619 (10529) EPC FOR OILY WATER TREATMENT PLANT UPGRADE & INSTRUMENT AIR NETWORK UPGRADE AT ZIRKU ISLAND | PIPE(NICKLE ALLOY) FITTING(NICKLE ALLOY) |
| 2025. OCT 2026 JAN | UAE | DUBAI PETROLEUM | PVF | Project No: 24-SUN-E-CON-01 Sunrise Process Facilities Project | PIPE(WELDED CS PIPE) |
| 2024 OCT 2025 AUG | IRAN | PGMC | FARADAST ENERGY FALAT | PROJECT: Persian Gulf Mehr Refinery Project | PIPING MATERIAL (PIPE, FITTING, FLANGE, VALVE) |
| 2024. AUG 2025 DEC | UAE | ADNOC ONSHORE | BILFINGER TEBODIN MIDDLE EAST LTD | ADNOC ONSHORE ONE TIE-IN PROGRAM ADNOC Onshore Contract No.: 4700016096 ADNOC Onshore Project No.: P30345 | MATERIAL REQUISITION FOR CS/LTCS SEAMLESS PIPES (PACKAGE 1-12) |
| 2024. JAN 2025 DEC | UAE | ADNOC ONSHORE | BILFINGER TEBODIN MIDDLE EAST LTD | ADNOC ONSHORE ONE TIE-IN PROGRAM ADNOC Onshore Contract No.: 4700016096 ADNOC Onshore Project No.: P30345 | PIPEPING MATERIAL,(SS,DSSS) |
| 2024. JAN 2025 DEC | UAE | ADNOC ONSHORE | BILFINGER TEBODIN MIDDLE EAST LTD | ADNOC ONSHORE ONE TIE-IN PROGRAM ADNOC Onshore Contract No.: 4700016096 ADNOC Onshore Project No.: P30345 | PIPING MATERIAL(CLADDED PIPE) |
| 2024 JAN 2024 JUN | UAE | DUBAI PETROLEUM | OEML | ONE OFFSHORE PLATFORM | PIPE,FLANGE,FITTING |
| 2024 APR 2024 JUN | KUWAIT | KOC | COMBINED GROUP CONTRACTING CO.(K.S.C.) | OFF-PLOT WORKS FOR JURASSIC PRODUCTION FACILITIES AT NK AREAS (ADJUSTMENT ORDER NO. 1)–IMPLEMENTATION OF MOC PACKAGE FOR 12” PIPELINE TIE-IN TO KOC 24” PIPELINE | PIPE (CS) |
| 2024. JAN 2024 Aug | UAE | ADNOC ONSHORE | PME | ADNOC PO 4500087235 | PIPE,(CS) |
| 2023 NOV 2024 JAN | INDIA | KUTCH COPPER LTD | ADANI | KCL/FT-PO-KJ -252-23 | PIPE (CS) |
| 2023 JAN 2024 JUN | ALGERIA | SONATRACH | GGE / GCB / ENAC GROUP | OD1 16'' PIPE REPLACEMENT (TD EL BORMA – TA PK 137 KM PC01) | PIPE,FITTING,FLANGE,GASKET,STUD BOLTS,BARRED TEE |
| 2022 AUG 2022 DEC | KUWAIT | KOC | COMBINED GROUP CONTRACTING CO.(K.S.C.) | INSTALLATION OF FLOWLINES FOR PRODUCER WELLS IN NORTH KUWAIT | FITTING,FLANGE,GASKET,STUD BOLTS |
| 2021 NOV 2024 JUN | ALGERIA | SONATRACH-ENI | SONATRACH-ENI | SUPPLY OF SURFACE INSTALLATION MATERIALS (BULK PIPING, MANUAL VALVES AND CONTROL VALVES) FOR GAS PRODUCING WELLS | FITTING,FLANGE,FASTERNERS,INSULATION KIT,INSULATION FLANGE |
| 2022 JAN 2022 JUN | KUWAIT | KOC | CGC | KOC EX. WORKS JURASSIC | PIPE,BEND,FITTING,FLANGE,GASKT,FASTENERS,INSULATION SPACER,END SEAL |
| 2022 AUG 2023 FEB | KUWAIT | KOC | SPECTO | JURASSIC PRODUCTION FACILITY-4 (JPF-4) AT NORTH KUWAIT | PIPE(CS) |
| 2022 OCT 2023 APR | KUWAIT | KOC | JEREH | JURASSIC PRODUCTION FACILITY-5 (JPF-5) AT NORTH KUWAIT | PIPE(CS) |
| 2022 JUN 2022 NOV | TURKEY | BOTAŞ | KOLIN KALYON JOINT VENTURE | KUZEY MARMARA UNDERGROUND GAS STORAGE EXPANSION (PHASE III) PROJECT | PIPE,FITTING,FLANGE,SPECTACLE BLANK(CS,LTCS,WPHY,SS) |
| 2022 APR 2022 NOV | IRAQ | BP-ROO | WOOD | TRUNKLINES AND MANIFOLDS PROGRAMME 2022 | BEND(WPHY) |
| 2022 APR 2022 AUG | INDIA | RELIANCE GROUP INDIA | RELIANCE GROUP INDIA | RPTL/PO-2189/22-23 | PIPE(X60) |
| 2021 Oct | KOREA | HYUNDAI HEAVY INDUSTRY | HYUNDAI HEAVY INDUSTRY | SHIPPING BUILDING MATERIAL PROCUREMENT | PIPE(CS) |
| 2022 Aug 2022 Dec. | UAE | ADNOC GAS | L&T | ADNOC GAS PROCESSING EXECUTE STAGE RUWAIS CAPACITY ENHANCEMENT OF NGL TRAINS 1, 2, 3 & 4 | PIPE, FITTING,FLANGE |
| 2022 APR 2022 AUG | BRAZIL | TOTAL | KGS | OFFSHORE PRODUCTION PLATFORM | PIPE(X60) |
| 2022 APR 2022 AUG | UAE | ADNOC ONSHORE | OEML | EPC FOR DABBIYA THAMAMA B TRANSITION ZONE DEVELOPMENT- PHASE II | PIPE(CS) |
| 2021 DEC 2022 APR | UAE | ADNOC ONSHORE | OEML | EPC FOR CALL-OUT CONTRACT FOR BU HASA WELLHEAD REMOTE MONITORING AND CONTROL IMPLEMENTATION AND CONSTRUCTION OF OIL NETWORK OVER PRESSURE PROTECTION-LONG TERM; | PIPE(CS) |
| 2021 DEC 2022 JAN | IRAQ | KURDISTAN PIPELINE COMPANY PTE.LTD. | OEML | KPC2101-0000-PRC-TP-0048 SUPPLY AND DELIVERY OF TUBULAR GOODS | PIPE,FITTING, FLANGE,GASKET,FASTENERS(CS) |
| 2021 OCT 2021 DEC | KUWAIT | KOC | COMBINED GROUP CONTRACTING CO. (K.S.C.C) | OFF-PLOT WORKS FOR JURASSIC PRODUCTION FACILITIES AT NORTH KUWAIT AREAS (FOR SECTION-II) | ANCHOR FLANGE(CS) |
| 2019 MAR 2021 DEC | IRAQ | BP-ROO | PETROFAC | RUMAILA BROWNFIELD PIPING ROAD CROSSING | END SEAL,SPACE INSULATOR |
| 2021 MAY 2021 AUG | ARGENTINA | WOOD | WOOD | BUENOS AIRES REFINERY PRODUCT QUALITY 2022 (PQ2022) | PIPE(CS,AS) |
| 2021 MAR 2021 MAY | COSTA RICA | BUHLMANN SPAIN,S.L.U. | BUHLMANN SPAIN, S.L.U. | CARBON STEEL PIPE PURCAHSE PLAN | PIPE(CS) |
| 2019 AUG 2021 NOV | PAKISTAN | DESCON ENGINEERING LTD. | DESCON ENGINEERING LTD. | ENGINEERING FOR WELLHEAD SURFACE FACILITIES & TIE-INS OF WAVE-03 WELLHEADS | PIPE,FLANGE,FITTING (CS,SS,DSS) |
| 2020 SEP 2020 NOV | UAE | ZADCO | FALCOR ENGINEERING & CONTRACTING SERVICES | ZAKUM DEVELOPMENT COMPANY ENGINEERING AND TECHNICAL SERVICES ENGINEERING (ETE) | PIPE (CS, SS) |
| 2020 APR- 2021 FEB | KUWAIT | KOC | COMBINED GROUP CONTRACTING CO.(K.S.C.) | JURASSIC PRODUCTION FACILITIES OFF-PLOT WORKS AT NORTH KUWAIT AREAS. PR 100064871 | FITTING,FLANGE (CS FOR SOUR SERVICE) |
| 2020 MAR 2020 DEC. | NIGERIA | DANGOTE | CHEMIE TECH | DANGOTE REFINERY & PETROCHEMICALS PROJECT | PIPE,FITTINGS (CS,SS,NICKEL ALLOY) |
| 2020 SEP 2020 DEC | UAE | ADNOC ONSHORE | FORTUNE | EPC FOR PROCESS CONTROL & POWER SYSTEM UPGRADE/REPLACEMENT AT BAB | PIPE,FITTING,FLANGE (CS,SS ) |
| 2019 NOV 2019 DEC | PAKISTAN | ENGRO POLYMER AND CHEMICALS | GASCO ENGINEERING (PVT.) LTD. | EPC OF 6" EDC PIPELINE FROM EPCL TO EVTL | PIPE,FITTING,FLANGE,GASKET,STUD BOLT,INSULATION JOUNT |
| 2020 MAR. 2020 DEC | SAUDI | SABIC | BTC | ONE JUBAIL TERMINAL MODIFICATION (DEG) | PIPE,FITTING(SS) |
| 2019 SEP – 2021,MAY | UAE | ADNOC ONSHORE | AL ASAB | RUMAITHA THAMAMA ZONE B PHASE III EXPANSION DEVELOPMENT & CONVERSION OF RA PHASEI/II CO2 AFFECTED WELLS | PIPE FOR SOUR SERVICE |
| 2018 SEPT. 2019 | ALGERIA | SONATRACH | ENSP | 142/HMD/2018 | FITTING (CS) |
| 2018 SEPT. 2019 | ALGERIA | SONATRACH | ENSP | 143/HMD/2018 | FLANGE,FITTING,GASKET,FASTENERS (CS,AS) |
| 2018 SEPT. 2019 | ALGERIA | SONATRACH | ENSP | E18/DP-AT/122 | FLANGE,FITTING,GASKET,FASTENERS (CS,AS) |
| 2018 SEPT. 2019 | ALGERIA | SONATRACH | ENSP | CN/037/18/C/C43 | VALVE,FLANGE,FITTING,GASKET(CS,SS,AS) |
| 2018 OCT. 2019 JAN. | OMAN | OCCIDENTAL OF OMAN | AL SIDRAH OIL & GAS | OXY OMAN NORTH FACILITY | BEND (CS) |
| 2018 DEC. 2019. | IRAQ | HALFAYA OILFIELD | CPP | HALFAYA OILFIELD 2019 OILWELL MAINTENANCE | VALVE,PIPE,BEND,FITTING,FLANGE,FASTENERS,GASKET (CS) |
| 2018 APR. 2019 JAN. | PHILIPPINE | JG SUMMIT PETROCHEMICAL | FLUOR/CTCI | JG SUMMIT STAGE 1 EXPANSION PROJECT | PIPE (CS) |
| 2018 DEC. 2019. | UAE | ADNOC | ROBTSTONE MIDDLE EAST | BU HASA INTEGRATED FIELD DEVELOPMENT PROJECT | PIPE(CS) |
| 2018 APR. 2019 JAN. | SUADI ARABIC | ARAMCO | CPP | SEVERAL PIPELINE HYDROSTASTIC TEST | VALVE.FLANGE,FITTING,GASKT,FASTENERS (CS) |
| 2018 OCT . 2018 DEC. | PAKISTAN | ENGRO POLYMER AND CHEMICALS | GASCO ENGINEERING (PVT.) LTD. | EPC OF 6" EDC PIPELINE FROM EPCL TO EVTL | FITTING,FLANGE,GASKET,INSULATION KIT. (CS) |
| 2018 APR. 2018 JUN. | IRAQ | MINISTRY OF NATURAL RESOURCES | DNO | TAWKE PROJECTS | BEND (CS) |
| 2018 MAY 2018 SEPT. | BANGLADESH | CONFIDENCE POWER | ROLLS-ROYCE INDIA PRIVATE LIMITED | CHUHOR AND LOHONI, PAIRABOND | PIPE,FITTING,FLANGE,VALVE,GASKET,FASTENERS (CS,SS) |
| 2018 JUN. 2018 SEPT | PAKISTAN | PAKARAB FERTILIZERS LIMITED | PETROCHEMICAL ENGINEERING CONSULTANTS | PAKARAB FERTILIZER GAS PIPELINE | PIPE (CS) |
| 2018 MAR. 2018 DEC. | NIGERIA | DANGOTE | CHEMIE TECH | DANGOTE REFINERY & PETROCHEMICALS PROJECT | PIPE (CS) |
| 2017 DEC. 2018 MAR. | QATAR | QATAR GENERAL ELECTRICITY & WATER CORPORATION | HBK CONTRACTING CO W.L.L | GTC 626/2014. CONSTRUCTION OF MEGA RESERVOIRS PRPSS (PACKAGES B) | FLANGE(DN2200 AND DN2400) |
| 2017 DEC. 2018 OCT. | PAKISTAN | BP | IPS | PIPELINE MAINTENANCE | FLANGE,PIPE,FITTING (DSS,SS) |
| 2017 DEC. 2018.MAR. | IRAQ | HALFAYA OILFIELD | CPP | HALFAYA OILFIELD 2018 OILWELL MAINTENANCE | VALVE,PIPE,BEND,FITTING,FLANGE,FASTENERS,GASKET (CS) |
| 2017 SEP. 2017 OCT. | ALGERIA | ENSP | ENSP | 002/CT/JUR/15/PO17217 | FLANGE,FITTING,GASKET,FLANGE ADAPTER (DSS,CS) |
| 2017 AUG. 2017 EPT. | ALGERIA | ENSP | ENSP | 002/CT/JUR/15/PO17183 | STUDDED CROSS (CS) |
| 2015 DEC. 2017 AUG. | KUWAIT | KOC | SCHLUMBERGER | UMM NIQA | PIPE,FITTING, FLANGE(SS/CS/LTCS/DSS/CUNI ) |
| .2016 DEC. 2017 UG | KUWAIT | KOC | MECHANICAL ENGG.&CONT.CO.W.L.L | REPLACEMENT OF NON-NACE/HIC AFFECTED SEPARATORS AT SEK GC’S 1 3 4 6 & 8 | FLANGE (CS) |
| 2016 DEC 2017 JAN. | ALGERIA | ENSP | ENSP | 021/CF/ENSP/FAB/EXP/16 | FITTING,FLANGE,GASKET,FASTENERS (CS) |
| 2016 JUL. 2016 EPT. | CAMEROON | TC GULF | PAN ARABIAN OFFICE | POHGIT16070063-ENQJBL16070044 | PIPE, FITTING, FLANGE, SPECTACLE BLIND (CS,SS) |
| 2016 JAN. 2016 DEC | UAE | ECOMAR | MUC , PYRAMID, ALSA | CYLINGAS-ECOMAR | BEND, FITTING, BARRED TEE (CS) |
| 2016 FEB. 2016 SEP.. | ROMANIA | TRANSGAZ | ENERGENTA | CONSTANTA CITY NATURAL GAS PIPELINE | PIPE,HOT INDUCTION BEND (L360NB,L415NB) |
| 2015 AUG-- 2016 EPT. | MOROCCO | ACWA POWER | SEPCO III | NOOR PHOTOELECTRICITY PLANT PHASE II, NOOR PHOTOELECTRICITY PLANT PHASE III | PIPE,FITTING,FLANGE(SS347H) |
| 2016 OCT. 2017 MAY. | RUSSIA | VNIPIGAZDOBYCHA | TECHNIMONT | AMUR GAS PROCESSING PLANT PHASE 4. GAS PROCESSING AND HELIUM COMPLEX | PIPE, BEND (CS) |
| 2016 MAR. 2016 JUN. | UAE | ADMA | CCEP,CCEL | NASR PHASE II FULL FIELD DEVELOPMENT PROJECT | HOT INDUCTION BEND (X60) |
| 2016 FEB- 2016 MAY | UAE | TAKEER | OEML | URGENT MAINTENANCE | FITTING (CS LCTS) |
| 2015 NOV 2016 APR. | OMAN | OOCEP | WOLLY PARSON | ABU TUBUL BLOCK 60 PROJECT | FITTING (CS,LTCS,DSS) |
| 2015 AUG-- 2016 AUG | CHINA | OCI KOREA | SMT(CHINA) | OCI JIANYANG | PIPE,FITTING,FLANGE,BEND (CS,SS) |
| 2015 DEC 2016 AUG | CHINA | OCI KOREA | SMT(CHINA) | OCI MAANSHAN | PIPE,FITTING,FLANGE (CS,SS) |
| 2015 FEB 2015 AUG. | IRAQ | SHELL,BGC,MITSUBISHI | WOLLY PARSON | REHABILITATION OF IRAQ SOUTH GAS FACILITIES – ZUBAIR INTEGRATED PRODUCTION FACILITIES PIPELINES & TIEINS | BARRED TEE (WPHY60) |
| 2016 AUG 2016 DEC. | IRAQ | SCOP | CPP,SCOP | NEW NASSIRIYA DEPOT | BAREDD TEE (WPB) |
| 2015 AUG. 2015 NOV. | ALGERIA | ENSP | ENSP | ENSP NEW OIL FIELD DEVELOPMENT | THREAD FLANGES FOR WELLHEAD (XC38) |
| 2014 OCT. 2016 MAY | TURKMENISTAN | STATE CONCERN “ TURKMENGAS” | HYUNDAI,TOYO,LG | ETHANE CRACKER AND PE/PP PLANT | PIPE (CS) |
| 2014 MAY 2014 DEC | VIETNAM | FORMOSA | POSCO E&C | FORMOSA HA TINH STEEL PLANT | PIPE,FITTING,FLANGE (CS,SS) |
| 2014 SEPT. 2015 APR | JORDAN | NATIONAL CHLORINE INDUSTRIES | UHDE THYSSENKRUPP | EXP/INQ 050/13 | PIPE,FITTING,FLANGE (CS,LCTS,SS) |
| 2014 SEP 2014 DEC | IRAQ | SHELL | PFF MIDDLE EAST | ARLY PRODUCTION FACILITIES PROJECT | PIPE (CS,LCTS) |
| 2014 APR. 2014 EPT | IRAQ | IRAQ OIL DEPARTMENT | DNO | TAWKE FIELD CRUDE OIL PROCESSING FACILITIES | PIPE ( X52) |
| 2014 JUN. 2014 SEPT | IRAQ | IRAQ OIL DEPARTMENT | DNO | TAWKE EXPORT PIPELINE PROJECT | HOT INDUCTION BEND (X60) |
| 2013 DEC 2014 MAY | IRAQ | IRAQ OIL DEPARTMENT | DNO | SUMMAIL GAS PROJECT | HOT INDUCTION BEND (X52) |
| 2014 JAN 2015 AUG | UAE | IL&FS PRIME TERMINAL FZC (IPTF) | IL&FS ENGG.& CONST.CO.,LTD | IL&FS PRIME TANK TERMILA (IPTT) -JETTY LINE | FITTING & BEND (CS) |
| 2013 AUG 2015 MAR. | IRAQ | PETRONAS | PETRONAS | PCIH BV-2012-PRD-390 | PIPE,FITTING, FLANGE (CS,LCTS,SS,N06625) |
| 2013 MAR. 2013 OCT | KUWAIT | KNPC | TECNIMONT | NEW ARGP / AGRP REVAMP | FITTING (CS ,LTCS,SS) |